Machine all parts unloading from container at site with proper safety precautions.
Machine proper alignment as per instruction given by supplier’s erection engineer.
All machine complete fitting as per erection engineer instructions.
If any machine internal ducting have with machine then fitting by us.
Machine all electrification work from machine panel and electrical panel erection done by our electrician as per drawing or supplier’s engineer instructions.
We do machine internal pipline as receive with machines.